Live sensor data, alerts and a 3D view of every building.
Procurement
Manage procurement drafts and submissions
| Title | School | Room | Category | Cost | Urgency | Status | Created | Actions |
|---|---|---|---|---|---|---|---|---|
| Re-issue: Fire alarm system upgrade | Greenfield Secondary | Library 10 | — | £68,321 | Medium | Draft | 24 Apr 2026 | View |
| Re-issue: Fire alarm system upgrade | Hillcrest Grammar School | Assembly Hall 5 | — | £52,950 | Preventive | Draft | 24 Apr 2026 | View |
| Re-issue: Smart thermostat installation across campus | Westgate Primary | Laboratory 11 | — | £46,569 | Medium | Draft | 24 Apr 2026 | View |
| Re-issue: Ventilation ductwork cleaning and repair | Westgate Primary | Cafeteria 8 | — | £95,791 | High | Draft | 24 Apr 2026 | View |
| Re-issue: Boiler replacement - Gas to heat pump conversion | Greenfield Secondary | Library 10 | — | £12,723 | Preventive | Draft | 24 Apr 2026 | View |
| Re-issue: Emergency roof membrane repair - Building A | Riverside Primary School | Gymnasium 13 | — | £105,144 | High | Draft | 24 Apr 2026 | View |
| Re-issue: HVAC compressor replacement - Main Hall | Riverside Primary School | Assembly Hall 1 | — | £115,097 | High | Draft | 24 Apr 2026 | View |
| Re-issue: LED lighting retrofit - All corridors | St. Mary's High School | Classroom 13 | — | £46,866 | High | Draft | 24 Apr 2026 | View |
| aircon is broken | Riverside Primary School | Assembly Hall 12 | — | — | Medium | Draft | 24 Apr 2026 | View |
| Insulation improvement - Cavity wall injection | Hillcrest Grammar School | Assembly Hall 10 | — | £51,216 | Preventive | Draft | 20 Feb 2026 | View |
| Window replacement programme - Phase 1 | St. Mary's High School | Classroom 10 | — | £62,115 | Critical | Draft | 20 Feb 2026 | View |